FYCS CRC / ICAR Wakim Control Center
Article administration
Structured intake, dependency control, approval lineage and governed exports.
FORMA / Governed visual export
ICAR Wakim watermark flow
Clean masters remain immutable. The exact registered ICAR Wakim logo is composited only into governed derivatives, which protect every Article 01 visual through publication.
- 01Select approved visualFour Project 418 assets only
- 02Apply exact ICAR logoNo typography · no redrawing
- 03Derivative QAPlacement, size and integrity verified
- 04Release to publishingApproved · LinkedIn handoff authorized
- Logo source
- Exact ICAR Wakim registered PNG
- Position
- Bottom right
- Logo size
- 180 × 180 px
- Border clearance
- 20 px right · 20 px bottom
- Logo opacity
- 100% · no transparency
- Drop shadow
- 20% black · 12 px blur · 4 px down
- Master policy
- Original untouched · derivative PNG only
Export is available under the approved Article 01 release record.


REGISTER IP + TLog
Version lineage
- Publishing handoff authorized · IW-418-REL-001
FISHEYE operator authorization moved Article 01 into the Scheduled stage for the 08:00 EEST LinkedIn slot. The governed HTML handoff is unlocked; Published remains zero until LinkedIn returns a live article URL.
- Elie Wakim final approval registered · IW-418-APR-002
Elie Wakim confirmed that the article was fully reviewed and authorized publication. Prior hold IW-418-HOLD-001 is closed, not deleted, and remains preserved in the approval lineage.
- FISHEYE footer lockup reinforced · CRC-BRAND-001
The exact supplied FISHEYE MediaLab logo is now presented in a larger, high-contrast ownership panel with responsive spacing. The full FISHEYE Content Studio IP statement, TLog tag and visit date remain directly adjacent.
- Platform identity renamed · CRC-NAME-001
The customer-facing and hosted platform name is now “ICAR Wakim CRC - LinkedIn Approval Gate.” Navigation, metadata, structured identity and deployment records are aligned; CRC v1.0 approval and the Article 01 review hold remain unchanged.
- 180 px watermark revision activated · IW-418-WMK-003 / IW-418-WMK-PUB-002
Following client-channel feedback that the 240 px mark was too prominent, the exact ICAR Wakim logo was reduced to 180 × 180 px across all four public review visuals, the Open Graph cover and the PDF. Position, 20 px clearance, full opacity and 20% shadow remain unchanged. Article 01 and LinkedIn publication remain on hold.
- Watermarked derivatives activated on Article 01 · IW-418-WMK-PUB-001
All four public review visuals and the Open Graph cover now use permanent governed derivatives under IW-418-WMK-002. Clean masters remain immutable. Article 01 and LinkedIn publication remain on hold pending Elie Wakim.
- CRC platform approved · CRC-PLATFORM-APP-001
FISHEYE CRC platform architecture, governance, metadata model, TLog, watermark derivative engine, Article Register, Kanban and administrative controls approved for operational use as v1.0. Article 01 remains REVIEW HOLD v0.4 pending Elie Wakim.
- 200% watermark scale approved · IW-418-WMK-002
The governed logo size increased from 120 × 120 px to 240 × 240 px. Exact ICAR Wakim logo, 20 px right/bottom clearance, full opacity and 20% drop shadow remain unchanged; WMK-002 supersedes WMK-001.
- Watermark render specification finalized · IW-418-WMK-001
Exact ICAR Wakim logo locked to bottom-right at 120 × 120 px and 20 px right/bottom clearance. Logo is fully opaque with a light 20% black drop shadow; non-destructive derivative flow active and publication still on hold.
- Visual feedback registered · IW-418-VIS-001
Image style was positively reviewed. A very light watermark was suggested; no watermark treatment has been applied pending Elie’s review and final direction.
- Release hold registered · IW-418-HOLD-001
Mme Jinane Wakim paused Article 01 until Elie Wakim reviews it. The pipeline remains at Awaiting approval and all release/export actions stay locked.
- Initial client approval registered · IW-418-APR-001
Mme Jinane Wakim initially approved Article 01 to proceed. The evidence remains preserved in sequence with the subsequent 14:08 hold.
- Article 01 moved to Awaiting approval
Kanban, register, article identity and customer-review state aligned; publication and clean HTML release remain locked.
- Open Graph metadata and cover registered · v0.4
Canonical URL, article metadata, Twitter card, structured data and dedicated cover derivative aligned for customer sharing.
- Elie Wakim editorial rewrite registered · v0.3
Seller-led voice strengthened; defensive documentation-gap framing removed; authoritative contextual backlinks added.
- v0.3 preservation checkpoint opened
Source, assets, governance state and review package prepared for immutable ZIP backup.
- Public customer review release · v0.3
Pipeline home and Article 01 prepared for public link access; LinkedIn publication remains locked.
- Platform IP ownership registered
FISHEYE Content Studio platform ownership, visit-date notice and approved brand marks applied.
- Visual review sequence and comments activated
Four governed inline visuals plus metadata; durable section-level review threads registered.
- Article workspace registered
ICAR Wakim parent workspace; Project 418 child activation.
- Article visuals classified
Six clean assets accepted; first composite retained as moodboard only.
- Client SoT ingested
Nine customer-source references retained without alteration.
- Knowledge transfer ingested
Project 418 LinkedIn full-transfer master v1.0 registered.
Governance
Authority and release
- Platform IP owner
- FISHEYE Content Studio / Nadim Abdel-Nour
- Platform TLog
- FYCS/ICAR/ARTICLE-SOT/2026-08-18/v1.0
- Article TLog
- FYCS/ICAR/ARTICLE-SOT/2026-08-19/v0.4
- Client
- ICAR Wakim
- Platform state
- APPROVED · v1.0
- Platform approval
- 18 August 2026 · 14:52 EEST
- Platform approval ID
- CRC-PLATFORM-APP-001
- Article state
- APPROVED · SCHEDULED · v0.4
- Final approver
- Elie M Wakim · ICAR Wakim
- Final approval
- 18 August 2026 · 20:04 EEST
- Article approval ID
- IW-418-APR-002
- Prior hold
- IW-418-HOLD-001 · CLOSED
- Release ID
- IW-418-REL-001
- Scheduled
- 19 August 2026 · 08:00 EEST
- Evidence
- WhatsApp confirmations · privately registered
- Article next gate
- LinkedIn publication confirmation
The final Elie Wakim approval closes the earlier hold while preserving the full audit sequence. FISHEYE release authorization unlocks the watermarked publishing package and clean HTML handoff. Article 01 remains Scheduled—not Published—until the live LinkedIn article URL is confirmed and registered.